NOVA-RWB-CAB

In the blowing cabin we are receiving the floc rock wool prepared into the trituration machine for blowing the straight pipe and components.
Dedicate blowing tooling are keeping together the inner/outer pipes during the blowing process, locking the two parts togehter.
Standard gap between the walls is 25-30-50 mm.
Blowing nozzle is working with pressure air for sending the material inside of tubes and, is working as an exhaust system for compensating/decompressing the imploding of the inner pipe during the process.
In the blowing cabin can be worked the following pieces:

  • straight pipe with lenght from 250 to 1500 mm
  • Inner diameter 80 mm , outer diameter 400 mm
  • Sector elbow with angles of 30°/45°/90°
  • Tee with angle of 135°
  • Tee with angles of 87°/90°

LOCKING OF DUAL WALL PIPES:

Novatec is manufacturing a metallic ring band (Patent solution) for the mechanic connection of inner/outer pipes.

By using this technology is preview the supplying of the following machinery:

  • PRESS FOR THE METAL RING PRODUCTION
  • MACHINE FOR THE LOCKING OF METAL RING INSIDE OF I/O PIPE
  • MACHINE FOR THE RING CLOSING AFTER BLOWING PROCESS

PS: for additional information please contact us.

LOCKING OF HALF SHELL ROCK WOOL:

Dedicate clamping device to fix and lock the half shell rock woll between inner/outer walls.

PS: for additional information please contact us.